Hull Repairs 1

The Hull of my 47' watson, is made from Double diagonal Mahogany, this construction is very strong, and allows the timbers to be "Cold Molded" that is bent without steaming. It is two layers of planking Inner 3/8" thick, outer 1/2" thick, with a layer of calico (Canvas) and white lead paste between. English oak and East Indian teak is also used in framing and other parts.

If you want to download plan of Boat as built click HERE

The RNLI made 2 good film's about the building of a Lifeboat "Boats that Save Life" & "The Craftsmanship of The Lifeboat Service" if you want to view them click on title.

Generally the hull is in good condition, although dried out a little from the last few years ashore, it has also suffered from local "electrolysis" where metal fittings come through the hull. So far I have not found this to be a major problem.

  • Bow standing well Bow standing well
  • Day one, with joint owner (sister) Day one, with joint owner (sister)
  • General paintwork condition, ROTTED OUT "GRAB" RAIL General paintwork condition, ROTTED OUT "GRAB" RAIL
  • Dried out planking, due to previous lack of paint, heat from exhausts, and electrolisis Dried out planking, due to previous lack of paint, heat from exhausts, and electrolisis
  • Primed and Calked with red lead putty Primed and Calked with red lead putty
  • Partial Port side repairs finished in 2nd Primer coat Partial Port side repairs finished in 2nd Primer coat
  • Bow...previous repair of solid oak and "Filler" failed Bow...previous repair of solid oak and "Filler" failed
  • New Oak splices in New Oak splices in
  • Repaired and ready for painting Repaired and ready for painting
  • Bow stem steelwork ready for painting Bow stem steelwork ready for painting
  • Primed Primed
  • Stb'd fore quarter stripped Stb'd fore quarter stripped
  • Stb'd fore quarter 1st primer Stb'd fore quarter 1st primer
  • Stb'd fore quarter calked Stb'd fore quarter calked
  • Stb'd fore Stripped and sanded. Stb'd fore Stripped and sanded.
  • Bow 2nd primer, Stb'd fore primer Bow 2nd primer, Stb'd fore primer
  • even just in primer looking better even just in primer looking better
  • Tother end....Stern post....before Tother end....Stern post....before
  • Stern post....after Stern post....after
  • Upper keelson (grabrail) Steelwork removed awaiting new replacement. Upper keelson (grabrail) Steelwork removed awaiting new replacement.
  • UPPER BILGE KEEL, OLD SCREW HOLES PLUGGED UPPER BILGE KEEL, OLD SCREW HOLES PLUGGED
  • UPPER BILGE KEEL, SANDED UPPER BILGE KEEL, SANDED
  • UPPER BILGE KEEL, PRIMED READY FOR STEEL UPPER BILGE KEEL, PRIMED READY FOR STEEL
  • UPPER BILGE KEEL STEELWORK SHAPED & DRILLED UPPER BILGE KEEL STEELWORK SHAPED & DRILLED
  • UPPER BILGE KEEL STEELWORK PRIMED UPPER BILGE KEEL STEELWORK PRIMED
  • All new silicone bronze screws....at great expense! and "bedded" on modern mastic All new silicone bronze screws....at great expense! and "bedded" on modern mastic
  • Stb'd side All fitted Stb'd side All fitted
     