Forward Shelter (Cabin) 2

The Restoration and alterations continue. Waste tank now fitted, and all pipe work. Not originally fitted in RNLI service but this is now required, because Sea Toilets are not allowed to discharge into the Sea on Inshore waters. Lots of work just for a C***.

The bunk spaces, originally half filled with Air Cases now need boards to support the Mattresses, another little, but time consuming job, wish I had bought a Barge with straight sides!

My next Job will be to move back to finishing the Heads, now the mattresses are out of the way!

  • All Day just to find a decent route for the vent pipe! And paint tank frame chocks! All Day just to find a decent route for the vent pipe! And paint tank frame chocks!
  • Not to RNLI spec, but hope it passes Quinton's Survey! Not to RNLI spec, but hope it passes Quinton's Survey!
  • Not a lot of room between cabin side and anchor rope tray. Not a lot of room between cabin side and anchor rope tray.
  • waste tank fitted,only just fits!,  just need pipe supports. waste tank fitted,only just fits!, just need pipe supports.
  • bunk cover boards, made and primed, hard work, working on boat, not much room but to wet outside. bunk cover boards, made and primed, hard work, working on boat, not much room but to wet outside.
  • Painted ready for fitting. Painted ready for fitting.
  • Pipes supported. Pipes supported.
  • Bunk Boards in. Bunk Boards in.
  • original 1990's matress in. Job finished, on to next section! original 1990's matress in. Job finished, on to next section!
  • new feed to double bottom ventilation new feed to double bottom ventilation
  • Fan mounting brackets for dbl bottom ventilation Fan mounting brackets for dbl bottom ventilation
  • New step, 2 jobs, makes it easier for short legged ppl from engine room and protects pipework! New step, 2 jobs, makes it easier for short legged ppl from engine room and protects pipework!
  • Step finished, one more daY FOR PAINT TO HARDEN Step finished, one more daY FOR PAINT TO HARDEN
  • fan mounting bracket finished and installed fan mounting bracket finished and installed
  • Fan fitted and running, just need to get Radio supressor capacitors and tidy wires. Fan fitted and running, just need to get Radio supressor capacitors and tidy wires.
  • Step finished....and it fits! Step finished....and it fits!
  • Cleaned ready for painting. not bad condition for 50+ years old. looking forward Cleaned ready for painting. not bad condition for 50+ years old. looking forward
  • looking aft. pity tank space and aft hold area not so good! looking aft. pity tank space and aft hold area not so good!
  • undercoat, ready for gloss undercoat, ready for gloss
  • access way into tank space, not original! access way into tank space, not original!
  • New steps in the style of the original's New steps in the style of the original's
  • built with hevier timber, for an owner that is larger! built with hevier timber, for an owner that is larger!
  • spot primed, holes drilled to tank space for new vent fan and Electric bilge pipe outlet spot primed, holes drilled to tank space for new vent fan and Electric bilge pipe outlet
  • well done Niki. well done Niki.
  • Ready to fit fan and Bilge pipes Ready to fit fan and Bilge pipes
     