Deck Repairs 6

The remaining Stancions now need to be removed, repaired, marked up (so they go back in the correct place) and then in for re-galvanizing.

Also the remaining toe boards are removed/repaired.

The anchor assembly, catling davit, all mountings and blocks removed for deck/coverboard repairs which were hidden under. Then after all repairs the whole lot re-installed!

  • all Port Stanchions ready for shot blasting, then re-galvanizing all Port Stanchions ready for shot blasting, then re-galvanizing
  • All marked up, original markings improved for visability. All marked up, original markings improved for visability.
  • all ready for repairs then galvanizing all ready for repairs then galvanizing
  • Stbd deck area i am working on Stbd deck area i am working on
  • stb' side with anchor fixings removed stb' side with anchor fixings removed
  • deck repairs needed, previous repair to be tidydied up deck repairs needed, previous repair to be tidydied up
  • anchor blocks and brass guards removed for repair anchor blocks and brass guards removed for repair
  • Last 3 toe boards for stripping and repair Last 3 toe boards for stripping and repair
  • sanded down looking better already! sanded down looking better already!
  • Repaired and Primed Repaired and Primed
  • all Stanchions, back from galvanisers, ready for de-nibbing all Stanchions, back from galvanisers, ready for de-nibbing
  • first few done! first few done!
  • cleaned up, previous repair "proud" so anchor blocks not seated properly, water backed up behind and rotted cover board. cleaned up, previous repair "proud" so anchor blocks not seated properly, water backed up behind and rotted cover board.
  • edge of fender timbers, rotted off & split because of large nails used to fix bronze "D" beading. edge of fender timbers, rotted off & split because of large nails used to fix bronze "D" beading.
  • timber removed ready for new graving piece. timber removed ready for new graving piece.
  • Re glued, ready for primer Re glued, ready for primer
  • first primer first primer
  • sanded, sanded,
  • primed ready for filling/calking etc. primed ready for filling/calking etc.
  • Masked ready for calking Masked ready for calking
  • calked up ready for "Blocks to be re-fitted calked up ready for "Blocks to be re-fitted
  • Anchor fittings back in place, Galvanised, then etch primed. Anchor fittings back in place, Galvanised, then etch primed.
  • the "black" is modern mastic bedding or deck caulk, all new fixings (Bolts and screws) the "black" is modern mastic bedding or deck caulk, all new fixings (Bolts and screws)
  • Overall view, Just 6' of cover board, deck seam to do, then Stbd deck 100% finished. (Well repaired, sealed and Primed!) Overall view, Just 6' of cover board, deck seam to do, then Stbd deck 100% finished. (Well repaired, sealed and Primed!)
     